
One of two options — a data center or a warehouse — is proposed for a nearly 79-acre parcel in Chantilly on what used to be called Lee-Jackson Memorial Highway.
The property owner is seeking Fairfax County’s permission to rezone a nearly 5.4-acre portion of the property for a data center or warehouse, according to an Oct. 3 application. The project is coined Chantilly Premier.
“The proposed development would encourage business and commercial endeavors in the area and add to the diverse industrial and commercial tax base surrounding Dulles Airport,” the application says.
Identified as PDCREF2 Chantilly LLC, the applicant says it’s open to dedicating the unused portion of the massive, undeveloped property — known as parcel six — to the county for preservation.
The site is currently zoned for two uses: highway commercial and general industrial. It’s located outside of the floodplain area roughly 1,200 feet west of Route 50’s intersection with Stonecroft Blvd.
The proposal would rezone most of the area that is not a floodplain for industrial uses in order to develop a 402,000-square-foot data center or a 150,000-square-foot warehouse.
Roughly 92% of parcel six will remain undisturbed.
The data center would include 50 parking spaces and two loading spaces. The building would be mostly screened from view from the highway and neighboring properties, according to the application.
The warehouse option is less intense, allowing 164 parking spaces and 30 loading spaces. It would also be screened mostly from view.
The application does not favor one option of the other, saying either use would “add to the diversity of industrial uses in the area and complement the automobile oriented uses to the east.”
The county has not yet accepted the application for review. It is in the initial planning phases.
Recent Stories

Synetic Theater Camps are a wildly fun, highly accessible choice for young people who love moving, playing games, and making memories. Registration is open now for Summer Camps (sessions June 20-August 25) and there are even a few spots left for Spring Break camp, April 3-7.
Located in National Landing, these performance-based camps are designed for students of all ages – no theater or performance experience required.
Led by professional teaching artists, campers learn acting, movement, and technical theater skills through the lens of Physical Theater. Physical Theater incorporates acting, movement, dance, mime, and acrobatics. If you’ve seen a Cirque du Soleil performance, you’ll find many similarities.

Press Release:
EDBS Dental Billing Solutions is pleased to announce that it has achieved compliance with the federally mandated standards of the Health Insurance Portability and Accountability Act (HIPAA) through the use of Compliancy Group’s proprietary HIPAA methodology, The Guard® compliance tracking software, and HIPAA Seal of Compliance®.
The HIPAA Seal of Compliance is issued to organizations that have implemented an effective HIPAA compliance program through the use of The Guard, Compliancy Group’s proprietary compliance tracking solution.
Clients and patients are becoming more aware of the requirements of HIPAA compliance and how the regulation protects their personal information. Forward-thinking providers like EDBS Dental Billing Solutions choose the HIPAA Seal of Compliance to differentiate their services.
McLean Volunteer Fire Department-Inova Blood Drive
MVFD has teamed up with Inova Blood Donor Services for a blood drive on Friday, March 31, in our lower parking lot at 1455 Laughlin Avenue. The blood drive will run from 1:30 p.m. to 5:30 pm. Please consider making
Van Metre 5K Run
Calling all serious runners, occasional joggers, and weekend walkers of all levels! Participate in the 31st Annual Van Metre 5K Run supporting Children’s National Hospital–the event that goes a long way!
Date: Saturday, April 29, 2023
Time: 8:30AM
Location: Broadlands