News

Fairfax County is gearing up to secure land rights to proceed with the development of a new shared-use path from the Innovation Center Metro station to surrounding neighborhoods.

At a meeting on Tuesday (Oct. 24), the Fairfax County Board of Supervisors unanimously agreed to set a public hearing for the project on Nov. 21.


News

Construction is about to ramp up on Dominion Energy’s undergrounding of a power line near the Spring Hill Metro station in Tysons.

The project will require an extended closure of the entire Vesper Trail from Route 7 (Leesburg Pike) to Vesper Street at Higdon Drive, starting Nov. 1, the utility company recently told residents in the area.


News

Fairfax County will add its voice to the chorus of local governments touting the presence and benefits of the Potomac Heritage National Scenic Trail.

The Board of Supervisors authorized staff on Tuesday (Oct. 10) to sign an agreement committing the county to developing, maintaining and promoting its segments of the trail, which spans almost 900 miles from the Allegeny Highlands in western Pennsylvania to the Potomac River’s mouth in Northern Neck.


News

Residents are calling on the Fairfax County Park Authority to ensure that a trail is constructed on the south side of a new tunnel in Colvin Run Mill Park.

Construction on the $1.5 million tunnel under Route 7 as part of the widening of Leesburg Pike is currently underway. But the project, which is managed by state officials, lacks a 1,000-foot trail to the south side of the tunnel that would allow residents to walk to the park’s sites in Great Falls, Lake Fairfax and Gerry Connolly Cross County Trail.


News

A ditch will no longer force pedestrians and bicyclists to ditch the shared path along Route 29 in Merrifield.

Construction has been substantially completed on a new, unbroken shared-use path spanning about one-third of a mile between Vaden Drive and Nutley Street, the Virginia Department of Transportation announced on Friday (Oct. 6).


News

(Updated at 3:45 p.m.) A years-long effort to build a pedestrian and bicycle trail along Fairfax Blvd (Route 50) is facing a roadblock.

At a public hearing last Tuesday (Sept. 26), the Fairfax City Council deferred action on a special use permit for nearly 12,000 square feet of trail in Shiloh Street Park (10400 Shiloh Street). The affected area requires the permit because it is zoned for residential development.


News

A rabid skunk was found on the Bull Run Occoquan Trail on Saturday, June 10, the Fairfax County Health Department confirmed today (Tuesday).

The skunk reportedly chased, sprayed and bit multiple hikers before it was found near Balmoral Terrace and Cannon Fort Drive in Clifton. Health officials advise that it may have had contact with other people or pets during the time that it was sick.


News

Questions continue to swirl around Lake Accotink Park’s long-term future, but that hasn’t stopped Fairfax County from pursuing some needed facility upgrades.

This Saturday (June 3), the Fairfax County Park Authority will celebrate the completion of its new Accotink Creek Crossing, a 320-foot-long concrete trail and 325-foot, elevated pedestrian bridge that closes 3.9-mile trail loop around the North Springfield park.


News

A connection has now been solidified between Herndon Metro station and Van Buren Street.

The Town of Herndon has completed construction of an 800-foot trail for pedestrians and bicyclists that connects the Metro station to Van Buren Street by Worldgate Centre.


News

Fairfax County leaders will hold a ribbon-cutting ceremony and an inaugural bicycle ride and walk tomorrow (Friday) to celebrate the completion of the Mount Vernon Memorial Highway Trail.

Mount Vernon District Supervisor Dan Storck will join the Fairfax County Department of Transportation and the Department of Public Works and Environmental Services at George Washington’s Gristmill to mark the finishing of the trail.


View More Stories