Email signup

County board approves first projects under McLean downtown revitalization plan

The adjacent Astoria mixed-use residential development and Mars headquarters expansion on Old Dominion Drive and Elm Street in McLean (via Fairfax County)

On their own, the first developments approved by Fairfax County since it overhauled its plan to revitalize downtown McLean seem modest.

One is a corporate headquarters expansion, while the other is a seven-story, mostly residential building, promising 130 new units of housing but not exactly rivaling the scale of the high-rises going up in Tysons.

However, the developers and county leaders anticipate that, when considered together, the Mars and Astoria projects will be transformative, a first step in the McLean Community Business Center’s evolution from car-centric strip malls and “superblocks” to a walkable, mixed-use neighborhood village.

“This has been a long process. It’s not just this application. It’s the whole CBC plan, the design guidelines, really reshaping McLean in a way that’s going to be amazing and permanent,” Holland & Knight partner Michelle Rosati told the Fairfax County Board of Supervisors at an Oct. 24 public hearing, where she represented Astoria developer JAG Partners LLC.

Approved by the board with back-to-back unanimous votes, the Astoria and Mars projects will redevelop adjacent commercial lots bounded by Old Dominion Drive and Elm Street. Those two streets will get a much-needed connection along the shared property line in the form of a linear park with an 8-foot-wide pedestrian walkway provided by JAG Partners.

The Mars expansion

Based in McLean since 1984, Mars filed a proposal in April 2022 that would double the size of its headquarters building at 6860 Old Dominion Drive to 126,974 square feet — the first rezoning application in downtown McLean since the Board of Supervisors adopted the new comprehensive plan in June 2021.

Under the development plan, the candy manufacturer will demolish a second office building on the site at 6867 Elm Street and shift parking to a 205-space underground garage. The existing surface parking will mostly be replaced by a 1,850-square-foot, publicly accessible park with seating and a pergola along Old Dominion Drive.

Mars has also agreed to upgrade a Metrobus stop on Old Dominion with a new bus shelter. A private amenity space for employees at the property’s rear will be renovated with walking paths and terraces for entertainment.

Cozen O’Connor land use attorney Evan Pritchard, representing Mars, noted that the new headquarters will add a loading dock with a mechanical turntable to avoid creating traffic issues on Moyer Place.

“The truck will be able to come front-end into the loading dock and be rotated 180 degrees,” Pritchard said. “It can do its unloading and drive right back out, which is not something I’ve seen before, so I want to toot Mars’ horn and the architects’ efforts.”

He also highlighted a relocation of exterior backup generators inside the two-story building as “a big improvement for the community” and architectural changes that will let in more natural light.

Astoria of McLean

The first mixed-use residential project to come out of the revitalization plan, the mid-rise, multi-family building will replace two office buildings at 6858 Old Dominion Drive and 6861 Elm Street and a standalone restaurant currently home to Moby Dick at 6854 Old Dominion Drive.

Reiterating comments made to the Fairfax County Planning Commission on Oct. 18, Rosati emphasized the development team’s prioritization of “the pedestrian realm” when designing Astoria.

Along with the aforementioned 0.34-acre linear park, JAG Partners will provide the streetscape recommended by the design guidelines that the Board of Supervisors approved for the McLean Commercial Revitalization District in September. That includes 8-foot-wide sidewalks with 6-foot-wide landscape panels along Elm Street, and a 12-foot-wide shared-use path along Old Dominion.

Mars has also agreed to the same commitments. Pritchard told the board that the Old Dominion pedestrian and bicycle path will be lined on both sides with two rows of trees. In addition, both projects will move all overhead utilities underground.

Noting that they’re are located in the 75-acre “Center Zone,” where the CBC plan envisions the highest-intensity development, Dranesville District Supervisor John Foust, who represents McLean, lauded both proposals.

The Mars project will give the company a “stunning corporate office,” while bringing the property up to “today’s high development and environmental standards,” he said. Astoria, meanwhile, will “provide much needed housing, including affordable workforce housing.”

According to a county staff report, JAG Partners initially proposed 12 workforce dwelling units (WDU), which would exceed county requirements for rental housing but not for for-sale units. The developer hasn’t indicated yet whether the building will have apartments or condominiums.

Staff also took issue with the locations and sizes of the WDUs. The developer later agreed to meet the county’s workforce housing policy, regardless of what kind of units will be constructed, and explained that the provided floor plans “are conceptual,” which alleviated staff’s concerns.

“It’ll also help diversify the mix of uses in McLean and provide a customer base, which has been missing for our small businesses, that will support existing and future commercial uses,” Foust said. “In my opinion, the design and layout of the building, along with the on-site park spaces and critical mid-block connection, will set a high bar for all future multifamily applications.”

Recent Stories

Good Wednesday evening, Fairfax County. Let’s take a look back at today’s stories and a look forward to tomorrow’s event calendar. 🕗 News recap The following articles were published earlier…

A 24-year-old man from Alexandria is facing multiple criminal charges for allegedly shooting a man he was trying to rob in Bailey’s Crossroads. Alexandria City police arrested Abner Neftali Selen…

Sushi Umi has arrived in Tysons. The Japanese restaurant began accepting pick-up orders at 7615 Colshire Road in the Scotts Run neighborhood on April 19 and quietly opened to dine-in…

In the future, Herndon hopes to see a vast swath of land near its Metro station transformed from aging, auto-centric commercial lots into a mixed-use, interconnected neighborhood. That vision solidified…

Potomac Harmony is Back! Following a gap year of competing, then virtual rehearsals during the pandemic, followed by the well-earned retirement of our long-term director, a year of a director search, Potomac Harmony hit the regional contest stage in Concord, North Carolina in March for the first time since 2018! It was exhilarating, reaffirming, and rewarding!

The chorus hit all of its goals, the biggest of which was to have fun and sing our best on contest stage — we did both! Because we earned a score over 400 points, our new Director, Allison Lynskey, was awarded the Novice Director award, photo above. Additionally, one of our charter members, Jackie Bottash, was nominated for and honored with the Leadership Excellence award. It was a celebratory weekend!

What’s next? So much! We now look forward to upcoming performances, growing our membership, and expanding our musical product with new arrangements and an education component each week. It’s an exciting time to be part of this ever-growing ensemble!

Read More

Submit your own Community Post here.

Pedal with Petals Family Bike Ride

Join us on Saturday, May 11th and ride into spring during our Pedal with Petals Family Bike Ride. Back for its second year, Pedal with Petals is going to be bigger than ever. This year’s event will include both an

Encore Creativity for Older Adults at Capital One Hall

Encore Creativity for Older Adults is pleased to raise the curtain and welcome community members to its spring concert at Capital One Hall in Tysons, VA on May 4, 2024. The concert, which starts at 3 PM, will bring hundreds

×

Subscribe to our mailing list